BIA | USA, 2025

Major Overhaul - Nuovo Pignone CO₂ Compressor Train

BIA| USA, 2025

Major Overhaul - Nuovo Pignone CO₂ Compressor Train

Date Completed

2024

Industry

Chemical

Location

Port Neil, USA

Total Man-hours

4746

Equipment Types

Multiple (Compressors, Steam Turbine, Gearbox)

Project Overview / Scope

Blackstone Industrial completed a major overhaul of a Nuovo Pignone CO₂ Compressor Train at a urea synthesis facility.

The project included full internal inspections, bearing replacements, valve work, and extensive balance of plant (BOP) maintenance across multiple equipment types, including:

  • Compressor 2MCL 806: Major internal inspection

  • Compressor 2BCL 306/A: Major overhaul and bundle swap

  • Steam Turbine SAC 1-8:

    • Replaced bearings and oil deflectors

    • Replaced main stop valve

    • Performed internal inspection

    • Removed and replaced HP/MP control valve rack actuators

    • Conducted internal inspection of HP/MP control valves

  • Gearbox (Flender TX32/1C): Minor inspection

  • Balance of Plant: Scheduled maintenance and oil changes

Challenges

  • Aging building cranes caused intermittent breakdowns, leading to some schedule delays.

  • Three contractors operated within the same compressor deck area, creating congestion and limiting crane availability.

  • Only one lifting bay was accessible for all trades, requiring precise coordination and scheduling to maintain workflow.

  • Widespread balance of plant work across the facility introduced logistical challenges with tooling and engineering support.

  • A single site engineer was responsible for much of the technical oversight, requiring strong communication and collaboration between teams.

Despite these challenges, the Blackstone and site coordination teams worked seamlessly to maintain progress, technical accuracy, and schedule adherence.

Customer Benefits

The facility benefited from Blackstone’s expertise, detailed pre-turnaround planning, and strong field leadership throughout execution.

Comprehensive Support: Early engagement with parts validation, tooling review, and documentation preparation provided a strong foundation for execution.

Seamless Collaboration: Close coordination between Blackstone field personnel and site engineering ensured efficient problem-solving.

Technical Excellence: Blackstone’s familiarity with Nuovo Pignone equipment, drawings, and manuals enabled efficient part sourcing and confident execution.

Reliable Results: The project was completed safely, on schedule, and with high-quality workmanship, minimizing downtime and optimizing equipment reliability.

“The customer saw the quality of work Blackstone brings to the table, with strong field performance, excellent documentation, and responsive leadership.”

Contattateci oggi stesso per scoprire come possiamo supportare il vostro prossimo progetto.